Item Title: |
Hebei Guohua Dingzhou Power Plant (2.4 million kW) Comprehensive Utilization of Flyash Project |
Item Sort: |
Chemical and Building Material |
Implementation Address: |
Investment Promotion and Cooperation Bureau of Baoding |
aggregate Investment: |
23 million USD |
Mode: |
Jiont Venture |
Ratio Between Investments in: |
35% |
Present Condition: |
The project has been investigated and testified on spot by experts from China Building Material Academy and Hefei Cement Institute. It mainly utilizes the local rich and low-cost resources of fly ash (utilization rate of 35%) and auxiliary material of sand and stone. The total investment: 10.24 million USD; Annual output of high-grade cement: 400,000 tons; Annual output value: 92 million RMB; Annual profit: 20 million RMB; Profit rate: 20.06%; Paid-off period: 5.76 years (including 2-year construction period). |
Item Introduction: |
The project has been approved by Hebei Economic and Trade Commission and the environmental protection assessment ratified and feasibility study compiled |
feasibility analysis: |
|
Correlative Files: |
No File
|